Energy
conservation is the prime purpose of the design MSTDO. One particular
application of the MSTDO is pressing of stairway lamps in a multi-storey
building. When one desires to reach a certain floor level using the stairway,
see figure below (A)
(A) Push button switches and lamps installed in the stairway of a multi-storey building.
Control Operation
Referring
to figure below (B), the neon lamps (N1,N2,N3…Nn) together with push button
switches (S1,S2,S3…Sn) respectively installed in each stairway level are
initially lighted on. The neon lamps are guide someone to reach on the stairway
switches especially at night time. The stairway lamp (L1,L2,L3…Ln). Contact C
(11-12)n will open to de-energize (light-off) condition.
Pressing
any one of the stairway switches (S1,S2,S3…Sn) will energize the timer TR (
2-7) and contactor C. Normally open instantaneous contact TR (1-3) will close
to maintain the timer (2-7) and contactor C continuously energized even the
press push button is stop. Contact C (1-2,3-4,5-6) will close to energized the
stairway lamps L1,L2,L3…Ln) contact C (11-12) will open to de-energized the
neon lamps (N1,N2,N3…Nn).
(B) Schematic diagram of the control circuit for “Multi Switching System with Automatic Time Delay Off”.
After
several minute, the time sufficiently set to allow a person travel from the
lowest to the highest floor level, the normally closed time delay contact TR (8-5)
will open to de-energized the timer TR (2-7) and contactor C. Contacts C
(1-2,3-4.5-6) will open to de-energized ,the stairway lamps (L1,L2,L3..Ln).
Contact C ( 11-12) will close to its initial condition to energized the neon
lamps (N1,N2,N3..Nn). Delay contact TR (8-5) will close and instantaneous
contact TR (1-3) will open.If it is
desire again to energize the stairway lamps (L1,L2,L3…Ln) one has to press
again any one of the stairway way push button switches (S1,S2,S3…Sn).
Read Next Article--->: MULTIPLE SWITCHING OPERATION APPLIED TO LIGHTS IN A CAMP
Back to Previous Article:<--- PERIODIC SEQUENCE CONTROL
Read Next Article--->: MULTIPLE SWITCHING OPERATION APPLIED TO LIGHTS IN A CAMP
Back to Previous Article:<--- PERIODIC SEQUENCE CONTROL
No comments:
Post a Comment